(The following was seen in the minutes:)
SOLE Committee Report.
����������� Gib Wiedenhoeft of SOLE reported that the group continues to work on a budget for the dredging project.� The hoped-for near-by site for dumping the dredged material is unavailable.� He has three contractors interested in the project, and because the material will have to be hauled farther than originally thought, the estimated cost is likely to be approximately $1.4 million.
�����������������������
Tuesday, March 13, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment